Visit to the construction site of the 101-home development (including 79 affordable housing units and 22 social housing units) in Bobigny.

Arte Charpentier is in charge of the architecture and landscape. Completion is scheduled for autumn 2024.

Comprising 4 buildings, the project integrates plants into the building.
The two visual openings required by the town’s urban planning regulations are enhanced by generous planted areas. These openings allow ecological corridors to be rebuilt, ensuring the continuity of planted areas for the movement of local wildlife, in line with the BiodiverCity ® label.

 

 

— Client: VINCI Immobilier Ile-de-France
— Team
Architecte: Arte Charpentier – Abbès TahirVivian CloezJean-frédérick Loko
Landscape designer: Arte Charpentier – Nathalie Leroy, Soizic Kenfort
— Engineering consultant
ACIPAB ENVIRONNEMENTGroupe QualiconsultETAMINEDorel Surulesco